Preliminary Inventory
2.00 Linear Feet
June 1996
Revised August 1996
Revised February 1998
Revised November 1998
Revised April 1999
Revised July 1999
Revised June 2002
Revised August 2009
File Drawer |
Description |
1 |
Consent Decree, United States of America vs. Inland Steel Corporation, 1993 |
|
Pre-investigation Evaluation of Corrective Measures Technologies Applicable to Remediation of Contamination Facility Wide, 1993 |
|
Description of Current Conditions, Volume I of IV: Text |
|
Description of Current Conditions, Volume II of IV: Tables |
|
Description of Current Conditions, Volume III of IV: Figures |
|
Description of Current Conditions, Volume IV of IV: Appendices |
|
Key Issues for USEPA Concurrence, 1995 |
File Drawer |
Description |
2 |
Quarterly Progress Reports, 1994-- |
|
Monthly Progress Reports,1994-- |
|
Voluntary Action Separate Phase Investigation Workplan -- Plant 2, Coke Plant, By-Products Area, 1996 |
|
Voluntary Action Separate Phase Investigation Workplan -- Former Creosote Plant, 1996 |
|
Voluntary Action Separate Phase Investigation Workplans -- Main Garage Repair Shop, No. 2 Basic Oxygen Furnace, and "B" Yard Locomotive Fueling Station, 1996 |
|
Voluntary Action Separate Phase Workplans -- "E" Yard Locomotive Fueling Station, "C" Battery Coke Plant By-Products Area, and No. 7 Blast Furnace Locomotive Fueling Station, 1996 |
RCRA Facility Investigation Workplan -- Inland Steel Indiana Harbor Works:
File Drawer |
Description |
3 |
Volume 1 of 6: Project Mangement Plan, November 1996 |
|
Volume 2 of 6: Quality Assurance Project Plan, November 1996 |
|
Volume 3 of 6: Health and Safety Plan; Data Management Plan; Community Relations Plan, November 1996 |
|
Volume 4 of 6: Appendix A -- Field Standard Operating Procedures, November 1996 |
|
Volume 5 of 6: Appendix B -- Analytical Laboratory SOPS, November 1996 |
|
Volume 6 of 6: Appendix B -- Analytical Laboratory SOPS (continued); Appendix C -- Physical Laboratory SOPS; Appendix D -- Data Validation SOPS, November 1996 |
File Drawer |
Description |
4 |
Phase I RFI Sampling and Analysis Plans, SWMA 1-14, June 1996-May 2000 |
4 |
Application for Corrective Action Management Units, January 1998 |
4 |
Ecological Risk Assessment, March 1998 |
4 |
Administrative Record, Inland Steel Indiana Harbor Worls, Corrective Action Management Units, April 1998 |
|
|
5 |
Phase I RCRA Facility Investigation (Screening) Report, SWMA 2(1 volume), 9, 10, 14 Volumes I and II, March 1999-May 2000 |
|
|
6 |
Phase I RCRA Facility Investigation (Screening) Report, SWMA 2, Volumes I and II, 6, May-August 2000 |
7 |
Investigation for Potential Stabilization Measure:
- Former C Battery By-products Recovery Area, May 1998
- Pattern Storage Building Area, May 1998
- Former Coal Tar Plant Area, July 1998
- No.7 Blast Furnace Locomotive Fueling Station, November 1999
|
|
Separate Phase Liquid Removal Plan for Stabilization Measures: Former C Battery By-Products Recovery Area, November 1998 |
7 |
Aquifer Test Reports:
- Former C Battery By-Products Recovery Area, July 1998
- Former Coal Tar Plant Area, November 1999
|
|
CAMU Reports
- Camu Stabilization Measures Work Plan for Soil Debris Remediation Activities, under Plant 2 By-Products and C Battery By-Products CAMUs, August 2001
- CAMU Stabilization Measures Work Plan for Demolition Debris Remediation Activities under Plant 2 By-Products CAMU, August 2001
- CAMU Stabilization Measures Work Plan for Low- pH Demolition Debris Remediation Activities under Plant 2 By-Products CAMU, August 2001
|
8 |
Phase I RCRA Facility Investigation (Screening) Report, SWMA 8,11 (Vols.I-II),12,13, 2001-2002 |
9 |
Report, RCRA Facility Investigation Workplan, Volumes I-VI, February 2003 |
10 |
Report, Lagoon Closure Certification, 80" Hot Strip Mill Lagoon, April 2003 |
|
Report, Phase II RFI Sampling and Analysis Plan Facility Perimeter, Area 1, July 2003 |
|
Report, Phase II RFI Sampling and Analysis Plan Facility Perimeter, Area 2, September 2003 |
|
Reports, Phase II RFI Sampling and Analysis Plan Facility Perimeter, Areas 3-6, April 2004 |
|
Report, Phase II RFI Sampling and Analysis Plan Interior Source Areas, March 2007 |
|
Report, Supplemental Surface-soil Sampling and Data Evaluation Plan, RCRA Facility Investigation Work Plan, June 2005 |
Subject Tracings
|