CRA376 -- Preliminary Inventory - Inland Steel Corrective Action Program Records
  

CRA 376: Subject Tracings

Preliminary Inventory

2.00 Linear Feet
June 1996
Revised August 1996
Revised February 1998
Revised November 1998
Revised April 1999
Revised July 1999
Revised June 2002
Revised August 2009


File Drawer Description
1 Consent Decree, United States of America vs. Inland Steel Corporation, 1993
Pre-investigation Evaluation of Corrective Measures Technologies Applicable to Remediation of Contamination Facility Wide, 1993
Description of Current Conditions, Volume I of IV: Text
Description of Current Conditions, Volume II of IV: Tables
Description of Current Conditions, Volume III of IV: Figures
Description of Current Conditions, Volume IV of IV: Appendices
Key Issues for USEPA Concurrence, 1995

File Drawer Description
2 Quarterly Progress Reports, 1994--
Monthly Progress Reports,1994--
Voluntary Action Separate Phase Investigation Workplan -- Plant 2, Coke Plant, By-Products Area, 1996
Voluntary Action Separate Phase Investigation Workplan -- Former Creosote Plant, 1996
Voluntary Action Separate Phase Investigation Workplans -- Main Garage Repair Shop, No. 2 Basic Oxygen Furnace, and "B" Yard Locomotive Fueling Station, 1996
Voluntary Action Separate Phase Workplans -- "E" Yard Locomotive Fueling Station, "C" Battery Coke Plant By-Products Area, and No. 7 Blast Furnace Locomotive Fueling Station, 1996

RCRA Facility Investigation Workplan -- Inland Steel Indiana Harbor Works:
File Drawer Description
3 Volume 1 of 6: Project Mangement Plan, November 1996
Volume 2 of 6: Quality Assurance Project Plan, November 1996
Volume 3 of 6: Health and Safety Plan; Data Management Plan; Community Relations Plan, November 1996
Volume 4 of 6: Appendix A -- Field Standard Operating Procedures, November 1996
Volume 5 of 6: Appendix B -- Analytical Laboratory SOPS, November 1996
Volume 6 of 6: Appendix B -- Analytical Laboratory SOPS (continued); Appendix C -- Physical Laboratory SOPS; Appendix D -- Data Validation SOPS, November 1996

File Drawer Description
4 Phase I RFI Sampling and Analysis Plans, SWMA 1-14, June 1996-May 2000
4 Application for Corrective Action Management Units, January 1998
4 Ecological Risk Assessment, March 1998
4 Administrative Record, Inland Steel Indiana Harbor Worls, Corrective Action Management Units, April 1998
5 Phase I RCRA Facility Investigation (Screening) Report, SWMA 2(1 volume), 9, 10, 14 Volumes I and II, March 1999-May 2000
6 Phase I RCRA Facility Investigation (Screening) Report, SWMA 2, Volumes I and II, 6, May-August 2000
7 Investigation for Potential Stabilization Measure:
  • Former C Battery By-products Recovery Area, May 1998
  • Pattern Storage Building Area, May 1998
  • Former Coal Tar Plant Area, July 1998
  • No.7 Blast Furnace Locomotive Fueling Station, November 1999
Separate Phase Liquid Removal Plan for Stabilization Measures: Former C Battery By-Products Recovery Area, November 1998
7 Aquifer Test Reports:
  • Former C Battery By-Products Recovery Area, July 1998
  • Former Coal Tar Plant Area, November 1999
CAMU Reports
  • Camu Stabilization Measures Work Plan for Soil Debris Remediation Activities, under Plant 2 By-Products and C Battery By-Products CAMUs, August 2001
  • CAMU Stabilization Measures Work Plan for Demolition Debris Remediation Activities under Plant 2 By-Products CAMU, August 2001
  • CAMU Stabilization Measures Work Plan for Low- pH Demolition Debris Remediation Activities under Plant 2 By-Products CAMU, August 2001
8 Phase I RCRA Facility Investigation (Screening) Report, SWMA 8,11 (Vols.I-II),12,13, 2001-2002
9 Report, RCRA Facility Investigation Workplan, Volumes I-VI, February 2003
10 Report, Lagoon Closure Certification, 80" Hot Strip Mill Lagoon, April 2003
Report, Phase II RFI Sampling and Analysis Plan Facility Perimeter, Area 1, July 2003
Report, Phase II RFI Sampling and Analysis Plan Facility Perimeter, Area 2, September 2003
Reports, Phase II RFI Sampling and Analysis Plan Facility Perimeter, Areas 3-6, April 2004
Report, Phase II RFI Sampling and Analysis Plan Interior Source Areas, March 2007
Report, Supplemental Surface-soil Sampling and Data Evaluation Plan, RCRA Facility Investigation Work Plan, June 2005

Subject Tracings

  • Inland Steel Company